Our Expertise
Building Lasting Solutions
Lanford Excavation LLC is committed to delivering high-quality habitat restoration and excavation services that stand the test of time. We take pride in our work and strive to exceed our clients' expectations.


Tiffany Fire Basin Restoration
Bureau of Reclamation and Sierra Soil & Water Conservation October 2024
$650,000.00
This project was working along the Rio Grande to remove 600 acres of Salt Cedar and other invasive species by plucking the root crown with an excavator and masticating all tree material using a mulcher.


.jpg)
Kirtland AFB Fuel Break
Kirtland AFB- Fuel Break- Edgewood, NM
November 2023-January 2024
$238,200.00
This project was implementing an 80-acre fuel break in the mountains of Kirtland AFB to assist with future wildfires. A dozer was used to push trees and create the break while skid steers followed behind to create piles and clean up.

.jpg)

Sunzia Transmission Reclamation
Pattern Energy-Sunzia Transmission Line
Socorro, NM September 2025
$253,683.40
This project consisted of cleaning out multiple dirt tanks on BLM property, road maintenance and construction, erosion control by placing concrete mats in water crossings and maintaining dust control during project. Our drone team produced before-and-after maps showing elevation changes at each water crossing.

.png)

Mims Pond Restoration
Sierra SWCD-Mims Pond-T or C, NM
2021-2022
$60,000.00
After reviewing treatment options, we removed salt cedar mechanically. An excavator and a bulldozer pulled the root crown of each plant, with hand work where needed. The removal of the root crown resulted in high mortality and long-term management of Salt Cedar in the treatment areas. Once we removed all plant material it was stacked in piles to be either burned or masticated. All work was conducted in a manner to mitigate impact to native plant species in the area.